---------------------------------------------------- | Cibles pour Courbes de Rotation d'Astéroides | | Mission T60 du 02-08-2010 au 08-08-2010 | ---------------------------------------------------- Date: 2010-7-29 Asc Dec Periode Debut.Obs(TU) Fin.Obs(TU) %Periode Ter-Obj Sol-Obj Elong Phase Mtot Mnuc Vit Dir Obj 2.04084 26.1536 11.48 00h30 03h30 25 2.34989 2.52243 87.7 23.7 12.7 44.2 43 (61) DANAE 18.44005 -14.0823 11.89 21h00 23h30 20 2.36884 3.30979 153.7 7.8 11.9 23.3 255 (48) DORIS 0.29327 -1.0930 10.60 00h30 03h30 30 2.06239 2.70749 119.2 19.1 12.2 4.8 89 (26) PROSERPINA 1.12366 4.1039 9.93 01h30 03h30 20 1.58649 2.12253 107.3 27.2 12.3 41.3 41 (36) ATALANTE Notes : (61) DANAE - Objet multiple ou suspecté multiple (48) DORIS - Observé le 2010-07-06 (26) PROSERPINA - Période ambigue : 13.13, 6.668